black and red usb flash drive beside silver and black click pen

Parapuar Masterplan: Four Zones, 19 Lots, and What Is Built vs Planned

The Parapuar masterplan is BPOLBF’s (Badan Pelaksana Otorita Labuan Bajo Flores) framework for developing a forested hillside above Labuan Bajo into an integrated tourism zone. The zone covers a total planning area reported at approximately 400 ha, of which BPOLBF holds a certified Land Management Right (Hak Pengelolaan / HPL) over ≈129.6 ha — the working land base on which the 19 investor lots sit. No single public masterplan PDF has been located online. The planning record derives from BPOLBF promotional materials, BKPM/Antara releases, and Jakarta Post advertorial content; the figure at bkpmri.id/pdf/parapuar.pdf could not be verified as a live document at the time of writing.

That distinction — between the promotional narrative and the documented regulatory record — is the thread running through everything on this page. Zones have reported hectare figures that come from a single critical source and are flagged UNVERIFIED. Attractions like the zipline, cable car, and inclinator exist in press releases. The access road and the 360° viewpoint exist on the hill. This page keeps those two columns separate.

What Parapuar Is — and Where the 400 ha Figure Comes From

Parapuar sits inside the Nggorang Bowosie forest in Kecamatan Komodo, Kabupaten Manggarai Barat, NTT — roughly five minutes from Komodo International Airport and about seven minutes from the Labuan Bajo waterfront. In Manggarai, para means gate or door and puar means forest, so the name is usually translated as “gateway to the forest” (Jakarta Post advertorial, 6 November 2023). The physical reality matches: the site occupies the forested ridgeline directly above the town.

The 400 ha total is used consistently in BPOLBF and BKPM promotional materials, including the BKPM article titled “The Parapuar Gateway” and the Jakarta Post advertorial series from 2023. It should be read as a planning perimeter, not a cadastrally confirmed boundary. No official gazette or publicly accessible survey document has been identified that anchors the 400 ha precisely. The portion of the zone where BPOLBF can actually offer lots to investors — the HPL Zone 1 — is approximately 129.6 ha.

The HPL: What ≈129.6 Ha Actually Means for Investors

On 15 September 2023, Deputy Minister of ATR/BPN Raja Juli Antoni handed the HPL certificate to BPOLBF at a ceremony at Parapuar, with Deputy Minister of Tourism and Creative Economy Angela Tanoesoedibjo also present (Antara English report 293823; Jakarta Post advertorial, 25 September 2023). The certificate covers HPL Zone 1. Its area is recorded in Indonesian land documents as 129,609 m² — or, in Indonesian decimal notation, 129.609 ha, which rounds to ≈129.6 ha. English-language coverage by Antara mistakenly printed “129,609 hectares,” which would equal 1,296 km² — physically impossible for a hillside above a small town. Windonesia.com and Wikipedia ID both carry the corrected “about 129.6 ha” reading. Wherever you see the figure “129,609 hectares” in English-language reports on Parapuar, treat it as a formatting error for 129.6 ha.

HPL (Hak Pengelolaan) is a state land management right held by BPOLBF as an authority body, not by investors. Investors do not buy land inside Parapuar. Instead they enter cooperation agreements with BPOLBF, and the standard Indonesian legal instrument would be an HGB (Hak Guna Bangunan, building-use right) granted on top of the HPL. PP 18/2021 allows HGB terms of 30 years, extendable by 20 years, and renewable for a further 30 years as a general ceiling — but BPOLBF has not published a standard lot lease term for Parapuar, and no official tariff list is public. Pricing is by direct negotiation with BPOLBF’s investment and cooperation division. That gap is material: investors must verify current terms before drawing up any business plan.

The Parapuar Zones Map: Four Zones and Their Reported Areas

BPOLBF’s public materials consistently describe four zones. Their official English names, as used in Antara, BKPM, and windonesia.com coverage, are the Cultural Zone (or Cultural District), the Leisure Zone, the Wildlife Zone (sometimes called Wild Nature), and the Adventure Zone. Neither a MICE zone nor a wellness/herbal-agro zone appears in official zone-name records — those labels belong to secondary broker marketing, not to BPOLBF’s framework.

Zone-level hectare breakdowns are harder to pin down. The only source that assigns specific areas to each zone is a single critical essay — “Komodifikasi Hutan Bowosie” on omong-omong.com — which is not an official planning document. The figures there are: Cultural ±114.73 ha, Leisure ±63.59 ha, Wildlife ±89.25 ha, Adventure ±132.43 ha. These sum to approximately 400 ha, which is consistent with the planning perimeter, but they carry UNVERIFIED status until a primary regulatory document corroborates them.

Parapuar Zone Summary — Reported Areas and Status (research date: June 2026)
Zone Reported Area (ha) Source / Status Described Purpose
Cultural Zone ±114.73 UNVERIFIED — single source (omong-omong.com) Heritage, arts, ethnographic experience
Leisure Zone ±63.59 UNVERIFIED — single source Hospitality, accommodation (e.g. Dusit on Lot 1.6)
Wildlife Zone ±89.25 UNVERIFIED — single source Nature conservation, guided forest experience
Adventure Zone ±132.43 UNVERIFIED — single source Active outdoor activities (see built vs planned below)
Total (planning perimeter) ≈400 (BPOLBF/BKPM) Consistent across promotional materials; not cadastrally confirmed Full Parapuar zone boundary
HPL Zone 1 (investment base) ≈129.6 (certified) HPL certificate handed over 15 Sept 2023; confirmed by Antara + Wikipedia ID Land available for the 19-lot investor programme

Resolving the Figure Contradictions

Three separate numbers appear in coverage of Parapuar, and readers who land on multiple sources will encounter apparent contradictions. Here they are, sourced and reconciled.

400 ha
The planning perimeter for the full Parapuar zone — consistently cited in BPOLBF, BKPM, and Jakarta Post advertorial materials since at least 2023. Not confirmed by a publicly accessible cadastral document. Treat as a planning-concept figure, not a certified land area.
≈129.6 ha (HPL Zone 1)
The actual certified land area handed to BPOLBF on 15 September 2023. This is the working investment land where the 19 lots are located. Indonesian land records write this as 129.609 ha (using a comma as the decimal separator), which Antara’s English desk rendered as the nonsensical “129,609 hectares.” The correct reading is 129.6 ha.
132.43 ha (Adventure Zone, UNVERIFIED)
The reported area of the Adventure Zone alone — which is larger than the entire HPL Zone 1. If accurate, this confirms that Zone 1’s ≈129.6 ha is a subset of the full 400 ha planning area, not the whole of it; the HPL may be expanded in future phases. The 132.43 ha figure comes from a single critical-analysis source and is UNVERIFIED against official records.

The “20% buildable” claim also needs unpacking. BPOLBF and Antara describe the development pledge as building on only 20% of the area while retaining 80% as forest. Wikipedia ID cites a “20.05% planned utilization of the HPL area.” Applied to 129.6 ha HPL, that would mean approximately 25.9 ha of built footprint — which is plausible for 19 lots of mixed resort, retail, and activity infrastructure. A separate figure — 7.94% — appears in the Adventure Zone framing: 10.52 ha of the reported 132.43 ha Adventure Zone area. These two percentages refer to different denominators and should not be compared directly.

The Parapuar Lot Map: 19 Lots and What Is Known

BPOLBF offers 19 investment lots on its HPL land (Antara English 315534; windonesia.com). No official public document provides a site plan parapuar investors can download — there is no publicly available parapuar lot map, no per-lot sizing table, and no asking-price list. The lot numbering system is partially visible from investor announcements, and parapuar available lots can only be confirmed via direct engagement with BPOLBF.

Two lot assignments are documented with sources and dates:

  • Lot 1.6 — Dusit (Thailand): A US$15 million hotel project was reported on 29 April 2025 by windonesia.com (“Investments to Parapuar Labuan Bajo continues to progress”). The Dusit brand flag — Dusit Thani, dusitD2, or ASAI — has not been confirmed publicly, nor has the key count, room type breakdown, or groundbreaking date. Status: described only as “still in progress” as of that report. Last verified: 29 April 2025 (single source).
  • Lots M and N — PT Terra SparX: A wellness and agro-tourism cooperation agreement between BPOLBF and PT Terra SparX was announced in a Kemenpar press release (kemenpar.go.id/berita/siaran-pers-bpolbf-gandeng-investor-perkuat-daya-tarik-wellness-dan-agrowisata-parapuar-labuan-bajo). The announcement date, investment value, lease term, and current construction status are not stated in publicly accessible records. Last verified: Kemenpar press release, date UNVERIFIED.

BPOLBF Plt Direktur Utama Frans Teguh stated in April 2025 that five to six investors had committed (Antara/windonesia). Dusit and Eiger (see next section) are the only two named publicly. The identities of the remaining three or four investors are not in the public record.

A combined committed-investment value of US$16.2 million (Dusit US$15M + Eiger US$1.2M) appears in Antara English report 315534. Both figures are single-source; treat them as reported, not independently verified.

If you are evaluating a specific lot, submit your enquiry via our contact form — we can introduce you to independent legal and market-entry specialists who work directly with BPOLBF processes and can verify current lot availability, sizing, and cooperation terms.

Built vs Planned: The Honest Infrastructure Ledger

One pattern in Parapuar coverage is consistent: advertorial and broker materials list the same set of future attractions as if they exist. They do not, as of mid-2026. Here is what the evidence supports in each column.

What Is Built (confirmed by event documentation and official reporting)

  • Access road, approximately 1.5 km: widely cited in BPOLBF speeches and media. Exact cost, engineering specification, and full completion date are not in public PUPR records. As of May 2025, approximately 200 metres of road remained to be completed (windonesia.com). Road construction details are unverified beyond the general reference.
  • 360° viewpoint (Natas Parapuar): elevation approximately 238 metres above sea level. This is the venue for the Weekend at Parapuar (WAP) event series — documented editions include 23 August 2025 (wonderfulkomodo.com) and PENTAS x WAP 2026 on 6 June 2026 (antaranews.com/berita/5597608), with 1,044 visitors recorded at the June 2026 event.
  • Lower viewpoint (Taman Parapuar): approximately 184 metres above sea level — referenced alongside Natas Parapuar in BPOLBF event materials.
  • Event space / Parapuar Park: groundbreaking was scheduled for 8 August 2024 (Tempo English 1898497). Physical completion status as of mid-2026 is UNVERIFIED; the WAP events confirm the site is functionally accessible.
  • HPL Zone 1 legal status: the certificate itself — “clean and clear” HPL — was handed over 15 September 2023. This is regulatory infrastructure, not physical, but it is the foundational completed step.

What Is Committed or Planned (not yet built as of mid-2026)

  • Dusit hotel, Lot 1.6: reported US$15M investment, status “in progress” (April 2025). No confirmed groundbreaking date.
  • Eiger Store + Coffee Shop: reported US$1.2M, PT Eigerindo Multi Produk Industri; construction start cited as an October 2025 commitment in the same 29 April 2025 report. Completion status UNVERIFIED.
  • PT Terra SparX wellness and agro-tourism lots (M and N): cooperation agreement announced, no construction update public.
  • Zipline, bike zipline: appears in Adventure Zone promotional descriptions. No groundbreaking or operator announcement identified.
  • Cable car (gondola): described in BPOLBF concept presentations. No construction contract or environmental permit public.
  • Luge track: listed in advertorial attraction inventories. No developer or timeline identified.
  • Elevated 360° cycling: concept description in Adventure Zone marketing. Not built.
  • Inclinator (hillside funicular): mentioned in BPOLBF vision materials. No construction record found.
  • Forest walk network beyond viewpoints: referenced as a planned experience layer. Current extent beyond the main access and viewpoint platforms is UNVERIFIED.
  • On-site utilities per lot: electricity, water, and telecom are described as being “staged” from 2024. No project-level documentation of the internal utility rollout has been located. Investors must verify utility availability for each specific lot directly with BPOLBF before committing.

The 2025 national infrastructure budget included significant cuts to PUPR new-build allocations (Indonesia Business Post, 2025), which adds an external headwind to the pace of on-site utility development that is independent of BPOLBF’s own construction schedule.

No Public Masterplan PDF — What the Planning Record Actually Is

Many investors researching the masterplan parapuar labuan bajo encounter the same gap: searches for a dedicated public “Rencana Induk Parapuar” document return nothing. The planning framework sits inside two broader instruments: Perpres No. 32/2018 (which established BPOLBF and defined the ~400 ha core area in Bowosie), and the 25-year Integrated Tourism Master Plan for Komodo NP–Labuan Bajo Flores (ITMP), a World Bank-supported planning exercise implemented via IPE Global. The ITMP covers the wider destination, not Parapuar’s internal lot structure.

What passes for a masterplan in public circulation is a combination of BKPM promotional articles, Antara wire releases, and Jakarta Post advertorial content — all BPOLBF-sponsored and all carrying marketing intent. The brochure URL bkpmri.id/pdf/parapuar.pdf could not be confirmed as a live document; the analogous Golo Mori brochure (bkpmri.id/pdf/tanamori.pdf) does exist, so a Parapuar equivalent may once have existed or may be published in future. Investors doing due diligence should request all planning and lot documentation directly from BPOLBF’s investment division rather than relying on circulating promotional PDFs.

The Bowosie Forest Context

Parapuar is carved out of Hutan Bowosie (Nggorang Bowosie), the forested hills that function as Labuan Bajo’s primary ecological buffer. Under Perpres 32/2018, approximately 400 ha of this state forest was designated for the tourism authority area. The forest release required a KLHK (Ministry of Environment and Forestry) decree before the ATR/BPN HPL process could complete. That specific KLHK SK number and date have not appeared in any publicly accessible media or NGO reporting — a genuine documentation gap that investors in transparency-sensitive categories should note.

Four kampung — Racang Buka, Kaper, Lancang, and Nggorang — have asserted customary and long-term occupation rights over parts of Bowosie, with some residents citing cultivation since the 1960s and 1970s. In 2022, residents physically blocked land-clearing machinery in the Parapuar area. Demonstrations occurred in Labuan Bajo in 2022 and 2023 while the HPL certificate was being processed. Advocacy has been documented by Sunspirit for Justice and Peace, Floresa.co, WALHI NTT, and AMAN Nusa Bunga. As of mid-2026, no publicly documented comprehensive settlement, compensation scheme, or formal recognition of adat claims has been announced. BPOLBF proceeded with HPL certification (September 2023), Parapuar Park groundbreaking (August 2024), and investor promotion (2025) while those claims remain structurally unresolved.

Wae Mese spring is the main named PDAM water source for Labuan Bajo. Labuan Bajo already has chronic water scarcity — intermittent PDAM supply, reliance on trucked water — and critics argue that clearing Bowosie worsens recharge capacity, flood risk, and landslide vulnerability. BPOLBF’s “80% forest retained” pledge is publicly challenged by environmental advocates on the grounds that even forest-retained land is fragmented by infrastructure corridors, water drainage alteration, and access construction. Both the pledge and the critique belong in any balanced due-diligence picture.

Committed Investors: A Tracker With Dates

The following table tracks the publicly documented investor commitments. Every entry carries its source, date, and verification status. “Committed” means an agreement or cooperation announcement has been reported; it does not mean construction is underway or complete.

Parapuar Committed Investor Tracker — as of June 2026
Investor Lot(s) Reported Value Project Type Status Last Verified
Dusit (Thailand) 1.6 US$15M (reported) Hotel (brand flag unconfirmed) “In progress” — no confirmed groundbreaking Windonesia.com, 29 Apr 2025 (single source)
PT Eigerindo Multi Produk Industri (Eiger) Not stated publicly US$1.2M (reported) Outdoor gear store + coffee shop Oct 2025 construction start committed; current status UNVERIFIED Windonesia.com, 29 Apr 2025 (single source)
PT Terra SparX M and N Not disclosed Wellness and agro-tourism Cooperation agreement signed; no construction update Kemenpar press release (exact date UNVERIFIED)
3–4 additional investors Not stated Not disclosed Unknown Referenced by Frans Teguh (BPOLBF Plt Dirut), April 2025; identities not public Antara/Windonesia, Apr 2025

Total publicly committed investment is US$16.2 million (Dusit + Eiger, per Antara English 315534). Both figures are single-source and UNVERIFIED at independent audit level.

Parapuar vs Golo Mori: A Quick Comparison

Investors comparing Parapuar to the Golo Mori zone (ITDC / InJourney Tourism Development Corporation, approximately 25 km southeast of Labuan Bajo) are comparing two fundamentally different governance structures, not just two tracts of land.

Parapuar vs Golo Mori — Key Structural Differences
Factor Parapuar (BPOLBF) Golo Mori (ITDC / InJourney)
Developer model Government authority body (BPOLBF) as HPL holder and cooperation counterparty State-owned enterprise (ITDC / InJourney), BUMN estate-developer model similar to Mandalika
Land area ≈129.6 ha HPL Zone 1 (part of ~400 ha planning zone) ≈20 ha developed core; expansion ambition up to 1,000 ha (planning target, not yet acquired)
KEK status Not a KEK. No KEK fiscal incentives apply. Proposed/planned tourism KEK — not yet established by PP. Verify against Dewan Nasional KEK list.
Orientation Hillside nature, culture, and adventure — forest-anchored Coastal MICE and resort — ASEAN Summit 2023 legacy
Operational venue (2026) 360° viewpoint + event space (WAP series active) Golo Mori Convention Center (GMCC) — operating MICE venue since December 2023
Investment brochure bkpmri.id/pdf/parapuar.pdf — not verified as live bkpmri.id/pdf/tanamori.pdf — confirmed live

Neither zone offers freehold land to investors. Neither carries confirmed KEK fiscal incentives. The GMCC at Golo Mori is an operating venue; Parapuar’s hospitality and retail lots are still in the commitment-and-planning stage. Those are material distinctions for investment timeline and operational risk assessment.

Incentives: The Candid Picture

Parapuar is not a KEK (Kawasan Ekonomi Khusus). The fiscal facilities created under PP 40/2021 for KEK zones — income-tax reduction schedules, PPN/PPnBM facilities, customs and excise exemptions, and KEK-specific licensing easements — do not apply in Parapuar. This is not a minor distinction: in Indonesian investment promotion, the KEK label carries specific statutory tax benefits, and Parapuar has not received that designation.

What BPOLBF publicly promises is land legality (the “clean and clear” HPL certificate), coordination with central and regional government, facilitation through BKPM/OSS-RBA channels, and DPSP (Destinasi Pariwisata Super Prioritas) policy backing as one of Indonesia’s five super-priority destinations. Those are real facilitation advantages. They are not fiscal incentives in the KEK sense.

Standard tax tools that might apply — the general tax allowance under PP 78/2019 (eligibility depends on KBLI code and regional annexes) and vocational-training super deductions under PMK 128/2019 — require case-by-case verification against current KBLI eligibility lists and post-2025 PMK updates. A tax holiday under PMK 130/2020’s pioneer-industry framework is unlikely for standard hotel or tourism operations, which are generally not on the pioneer-industry list. No Parapuar-specific fiscal incentive has been publicly promised in any BPOLBF, BKPM, or government document we could locate.

If you want to map out the entry structure, cooperation terms, and tax position for a specific project concept at Parapuar, our enquiry form connects you with vetted independent legal and investment specialists — or reach us on WhatsApp for an initial conversation. No one can pay to change what we publish; if you proceed with a specialist introduced through us, they may pay us a referral fee at no extra cost to you.

Frequently Asked Questions

Does a public Parapuar masterplan PDF exist that investors can download?

No publicly accessible masterplan PDF for Parapuar has been located. The URL bkpmri.id/pdf/parapuar.pdf could not be verified as live. What exists in the public domain is a body of BPOLBF promotional materials, Antara wire reports, BKPM articles, and Jakarta Post advertorial content — all useful as context but not equivalent to a regulatory planning document. For investment-grade documentation, request the current lot availability schedule, HPL certificate details, and cooperation scheme terms directly from BPOLBF’s investment division. The reference framework for the broader destination is the World Bank-supported 25-year Integrated Tourism Master Plan (ITMP) for Komodo NP–Labuan Bajo Flores, not a Parapuar-specific published plan.

How large is each Parapuar investment lot, and what are the available lots?

Lot sizes are not publicly documented. BPOLBF offers 19 lots total on its ≈129.6 ha HPL Zone 1. Two lot assignments are documented with sources: Lot 1.6 (Dusit, reported April 2025) and Lots M and N (PT Terra SparX, Kemenpar press release). The lot numbering convention visible from these announcements suggests a mixed alphanumeric scheme, but a full lot map or prospectus has not appeared in public records. Investors must engage BPOLBF directly — or through facilitated introduction — to obtain current availability and per-lot dimensions.

What does the ≈129.6 ha HPL Zone 1 certificate actually cover, and is there a Zone 2?

The HPL certificate handed over on 15 September 2023 covers BPOLBF’s Zone 1 — approximately 129.6 ha of the ~400 ha total Parapuar planning area. The zone-naming suggests that additional HPL phases (Zone 2 and beyond) could be processed for the remaining ~270 ha, but no public announcement of a Zone 2 HPL application or timeline has been identified. The reported Adventure Zone area alone (±132.43 ha, UNVERIFIED single source) exceeds the Zone 1 HPL, which is consistent with the full 400 ha planning perimeter requiring additional land-rights processing beyond the current certificate.

Are the zipline, cable car, luge, and elevated cycling at Parapuar operational?

No. As of mid-2026, none of these attractions is confirmed as built or operational. They appear in BPOLBF concept presentations and Jakarta Post advertorial content as planned Adventure Zone attractions. What is confirmed as physically accessible are the access road, the 360° Natas Parapuar viewpoint (used for WAP events with documented visitor attendance), and the lower Taman Parapuar viewpoint. Parapuar Park had its groundbreaking in August 2024; its completion status as of mid-2026 is unverified. Before planning a visit or investment predicated on any specific attraction, verify directly with BPOLBF or the operator.

Is Parapuar a KEK and does it offer tax incentives for investors?

Parapuar is not a KEK (Kawasan Ekonomi Khusus). The tax and fiscal incentives established under PP 40/2021 for special economic zones — income tax reductions, PPN/PPnBM facilities, customs exemptions — do not apply. BPOLBF offers land facilitation through its HPL cooperation framework and the benefit of DPSP super-priority destination policy support, but no Parapuar-specific fiscal incentive has been announced or gazetted. General investment tax tools under PP 78/2019 (tax allowance) may be applicable depending on your KBLI code and project structure; a tax specialist should verify this against current regulations before any business case is prepared.